EV CHARGING STATIONS

Charging that fits the property—and can grow with demand.

BrightOn Power installs residential charging and plans scalable commercial and strata systems around real electrical capacity, parking layout, access needs and future expansion.

Commercial and strata EV charging stations in a covered parking area

START WITH CAPACITY

Charger quantity, power level, load management and distribution evaluated as one electrical system.

WHO WE SUPPORT

One charging service. Three distinct property needs.

The right design depends on who will charge, where vehicles park and how much electrical capacity is available.

01 / RESIDENTIAL

Home EV Charging

Convenient Level 2 charging with the home’s panel, service and other electrical loads reviewed first.

  • Charger and circuit installation
  • Panel and service-capacity review
  • Indoor or outdoor locations
  • Load-management options
02 / COMMERCIAL

Workplace & Customer Charging

Charging stations that support employees, visitors, customers or tenants without losing sight of building operations.

  • Parking and distribution planning
  • Networked and access-controlled options
  • Load sharing and energy management
  • Phased expansion strategy
03 / STRATA

Strata & Multi-Unit Charging

A coordinated building approach for assigned stalls, shared chargers and long-term EV readiness.

  • Capacity review and EPR support
  • EV-ready infrastructure
  • Shared electrical-capacity management
  • Fair access and phased deployment
04 / FLEET

Fleet & Multi-Charger Sites

Charging power and schedules planned around vehicle dwell time, operating needs and expansion forecasts.

  • Charging-demand assessment
  • Power and distribution planning
  • Controls and scheduling
  • Utility and engineering coordination
COMMERCIAL + STRATA FOCUS

A scalable plan before isolated chargers are added.

For buildings with multiple users, the charger is only one part of the project. BrightOn Power reviews the shared electrical system and lays out a practical route from the first stations to broader future adoption.

01

Site & Usage Review

Confirm vehicle users, parking locations, charging windows and expected growth.

02

Capacity Assessment

Review the service, distribution and other loads that compete for available power.

03

Charging Strategy

Define charger power, quantity, load management, networking and access requirements.

04

Phased Design

Plan distribution and pathways so future stations can be added more efficiently.

05

Installation

Coordinate electrical work, equipment, permits, inspection and site logistics.

06

Commissioning

Test operation, confirm controls and provide the information needed to manage the system.

Planning one charger—or a building-wide system?

Select every residential, commercial or strata service that may apply. We will review the combined electrical scope.

SELECT EV CHARGING OPTIONS